Serra de l'Ebre
Needs attentionCatalonia · Wind · 57 MW installed · 5 technicians · manager Firas Cheaib
14.4 MW
25 %
226 MWh
96.6 %
9 / 13
6
Wind
6.5 m/s ESE
Irradiance
316 W/m²
Temperature
18.5 °C
Cloud cover
24 %
Conditions
Sunny intervals
Substation
Ascó SE 400 kV
Voltage
400.1 kV
Frequency
50.014 Hz
Power factor
0.982
Curtailment
8 %
Day-ahead price
50.43 €/MWh
Assets
13 assets on site. Open one for its live 3D view.
Wind turbine
WTG-03
Siemens Gamesa SG 5.0-145 · 6.2 MW
Output
6.20 MW
Today
36.8 MWh
Wind
12.9 m/s
Wind turbine
WTG-04
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.28 MW
Today
24.4 MWh
Wind
6.0 m/s
Wind turbine
WTG-05
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.00 MW
Today
10.4 MWh
Wind
5.3 m/s
Wind turbine
WTG-07
Siemens Gamesa SG 5.0-145 · 5.0 MW
Output
0.00 MW
Today
28.1 MWh
Wind
11.1 m/s
Wind turbine
WTG-09
Siemens Gamesa SG 6.6-170 · 6.2 MW
Output
0.14 MW
Today
17.7 MWh
Wind
5.9 m/s
Wind turbine
WTG-10
Siemens Gamesa SG 6.6-170 · 4.2 MW
Output
2.74 MW
Today
17.3 MWh
Wind
10.9 m/s
Inverter skid
INV-01
Sungrow SG3125HV-MV · 4.6 MVA
Output
4.14 MW
Today
24.9 MWh
Availability
99.5 %
Inverter skid
INV-02
SMA Sunny Central 4600 UP · 3.1 MVA
Output
1.27 MW
Today
16.5 MWh
Availability
96.3 %
Blade ice detected
Generator winding temperature high
Yaw misalignment above limit
Pitch system hydraulic pressure low
Cooling fan failure
Service interval exceeded